The team had a great time this morning, beginning with worship alongside the local Campus Crusade for Christ team. It was a time of songs, prayer, and testimony. Afterwards, we had cultural training to better equip us for the upcoming days in the field. Finally, following our local lunch, we worked at our first site of the trip. The bearings team successfully implemented their new bearings design, exceeding the team’s expectations. As for the IWP team, our system was smoothly installed with 1 exception. Data was collected after the system was installed to be processed upon return in the hopes to make further improvements. Below are some photos from the first site.
top of page
bottom of page
Thanks for the update!