top of page
Writer's pictureOwen Shea

The Final Sites

The team traveled to the final new site today – the furthest one away, which was over 30 km away. As per the norm, there were 2 pumps at the location, both of which received a full repair. However, only the first pump was overhauled with the IWP system and the Better Bearings bearing, while the second pump was just repaired. At the second pump, the team spent hours with the community playing football, singing songs, and generally getting to know them. Between pumps, part of the team was able to be led on a hike by a local pastor to a mountain top they frequent. Here are some photos of the day.
























27 views0 comments

Recent Posts

See All

Comments


bottom of page